Return on investment calculator

If you utilize Trimble RTX on the next project where it's a great fit, will the cost savings pay for the subscription?

Setting up a base station

Unpack gear, position and level tripod, tribrach, configure GNSS receiver, batteries, cables...

Packing up a base station

Tear down the base, disassemble gear, clean, pack, prepare for next day...

Setting up an external radio

Attach cables, assemble tripod, antenna, power and configure radio...

Packing up an external radio

Disassemble gear, clean, pack, prepare for next day...

Post processing data

Post-process survey data in the office.

Project cost

Total saved $1200,00